I plan to bring EWSD to Congress again. This congress will be from 27th to 30th of December 2025.
Last time it was a first try, but we managed to make most things work. We had between 50 and 100 lines deployed. I think that more Congress participants would like to have ISDN and analog lines this year.
There are some changes to the EWSD that will make things easier: Hardware, software and configuration has been improved.
Lets do that again with better preparation and less maintenance work during Congress.
Therefore I want to do a Kick-Off meeting on Sunday October the 5th at 15:00 CEST. If you want to volunteer again or if you are just interested, feel free to join at BigBlueButton
I will talk about new features, how to makes things easier this time. I like to diskuss how we set up SDH and access multiplexers this year.
We have not really had an EWSD focused marketing campaign, but loads of post cards and stickers generally related to Retronetworking - all of those are still in stock and will again be made available at 39C3 for sure.
We could print some additional/new ones like the EWSD-monolith design jolly created + showed above. I’m happy to take care of this if people can send me related [convincing] designs, ideally ready for printing on a postcard picture side without further editing. The rear side will be the “usual” one with the URL of isdn-museum.de
Yeah, my dream was alwas to do a FOSS implementation of ISDN video telephony so we could simply transcode audio + video and have random ISDN phones call into that service which would then send [every caller the same] audio + video. But well, sadly no time to ever complete that so far - and I think it’s unlikely I’ll get around to it in time for 39C3 either
I’ll try to write a little summary about the kickoff, apologies if I forgot something:
Work done:
EWSD: the configuration has been re-engineered, now we’ve new features (conferences, groups, …) and a lot more E1 ports available
EWSD: configuration interface has been improved, now batch configuration is supported and tracing facility over wireshark
EWSD: now have a plexiglass inner cover for safer display
EWSD: all the lines will be provisioned in advantage so the user can just plug in a V5 multiplexer (only some specific configurations need to handled manually, like multiple numbers on isdn lines)
ticket system: to collect in a central point issues and requests (has already mentioned by @jolly we’ve a queue/email on the eventphone ticket system)
Working on:
SDH: working on a new layout (it will be nice to be able to close the ring)
SDH: deploy more ADM (last year we deployed 10 out of 11 OMS)
find more OMS asdm: few additional units are already available
SDH: we’ve some Siemens Surpass hiT 7020 and 7030 devices for branching out or doing point to point (but the software is missing)
DCE: we’ve some modems to transport over a single twisted pair E1
V5: multiplexer we need more (last year we had 8 EKSOS)
V5: multiplexer to test, we’ve some non-nokia units to figured out if they works with our setup
V5: connect the EKSOS management ethernet somewhere (we don’t have enough ethernet line cards for the OMS, so one idea is a vlan on the NOC network but the media it’s 10BASE-T or worst 10BASE2 some media adapters may be needed)
Dialup: the same PM4 of the last year will be available (we’ve some issues on the ip pool for the internet access to work out)
Dialup: from the “Lessons Learned” of the last year @laforge proposed to use a PM3 instead
phone book: some admin right now are able to update the static entry on guru3
logistic: having the keys easily available for some specific rooms (for example the one behind the service elevators inside the angel’s kitchen where there is the access to the all patch panels of the old buildings including the plugs below the Hall H tank floor and the vertical cabling that goes for example to the NOC on the 2nd floor)
Wiki: we need to setup a new wiki page on redmine
The next meeting is scheduled on Sunday November the 2nd at 15:00 CET
Thanks for sharing your notes! I was thinking about posting mine, but your notes seem to be more detailed
→ Siemens Surpass hiT 7020 and 7030.
The 7020 has 2x STM-1, 8x E1 and 8 Ethernet ports. Kind of similar to the already used Ericsson OMS with less E1. More interesting is the 7030 unit, it is equipped with 4x STM-1 and 2x STM-4. So if we find a copy of the management tool (TNMS called) we are able to do branches in the SDH ring.
For point to point there is a small amount of RAD FCD-155 (I think @laforge has some of them in his collection and I have also a pair of two here). These multiplexers have two STM-1 Ports (only for redundancy, no ADM) and four to eight E1 ports.
thanks a lot. I sadly was not able to join last weekend, regretfully.
It’s great to hear about all the EWSD improvements. Thanks to @jolly and whoever might have helped with that.
I have a number (I’d guess at least 6, probably more, need to check when at home) RAD FCD-155, complete with break-out PCBAs that bring the 8xE1 from the SUB-D connector to regular RJ45 jacks. I even brought them to 38C3, but we didn’t need them back then. The nice part about them is that they don’t need any special management/config software; like all RAD devices they have a serial console for configuration (also accessible over telnet).
If it was up to me, I would suggest to replace it with a small PM3. We don’t need the PM4 port density, and at least I was rather annoyed by the super noisy fans of the PM4.
ah yes. I’m happy to bring one, I have a couple.
I’ll likely again be on the road at that time, but luckily not driving. I’ll join by smartphone, let’s see how well the cellular connection is
yes, that’s also another option. I’m happy with it either way, my main concern is not PM3 vs PM4 but the significant noise production in the area where we used to hang out around the EWSD.
I’ve sent in some minor updates as pull request earlier today. If anyone has changes but no account on git.cccv.de, I’m happy to take your patches and apply + push them.